MISSION


Himachal Pradesh Area Load Despatch Center (HPALDC) ensuring integrated operation of the power system of HP State Electricity Board Ltd. with the Northern Region Load Dispatch Center of India. Safe operation of the Grid e.g. for controlling over drawals in low frequency regime etc. and thus avoiding the Grid collapse. The responsibility of ALDC of HPSEB Ltd. being sole distribution licensee in the State is of paramount importance as that of the SLDC for effective demand management in its area of supply throughout the State and to ensure control over Grid parameters. Therefore both ALDC and SLDC need to complement and supplement each others functions. Further to carry load & demand management through real time operations for ensuring availability of quality and uninterrupted power to its consumers.



  * Agenda for 158th OCC meeting.   * Deviation Settlement Account for the week 250319-310319   * Allocation of Power from CGSs (Revision # 01/ 2019-20 )   * Provisional REA for the month of March 2019   * Notice for 158th OCC meeting.   * Minutes for 157th OCC meeting.   * Additional Agenda for the 41st TCC and 44th NRPC Meeting.   * Final REA for the month of August, 2018   * Swapping of Power up to 550 MW on 'As and When Available/ Required Basis' Banking arrangements for FY 2019-20-Offers thereof   * Revision in Allocation of Power from CGSs (Revision # 12/ 2018-19 w.e.f. 00:00 hrs of 01.02.2019   * Tender Document for Sale by HPSEBL for 2019-2020   * Tender Document for Banking of Power by HPSEBL for 2019-2020   * Tender Document for Renewable Power by HPSEBL for 2019-2020   * Minutes for 14th meeting of TEST Sub committee.   * Notice for the 41st TCC and 44th NRPC Meeting.   * Minutes for the 40TCC-43NRPC Meeting.   * Agenda for 14th meeting of TEST Subcommittee.   * Additional Agenda for the 40th TCC and 43rd NRPC Meeting.   * Agenda for the 40th TCC and 43rd NRPC Meeting.   * Notice for the 40th TCC and 43rd NRPC Meeting.   * SINGLE LINE NETWORK DIAGRAM OF HPSEBL (66KV and above)   * Atlas of HPSEBL Power Grid with detail of Sub-Stations (66kV & above), Optical Network and PLCC network of HPSEBL. * MULTI-YEAR TARIFF PETITION FOR 3rd CONTROL PERIOD FY 2014-15 TO FY 2018-19 * HPSEBL - TARGET MONITORING & REVIEW SYSTEM      * GoHP Notification dated 10-06-2010: Notification & Agreement       * Procedure for Real Time Operations.    * Maximum Demand of the State on Dated 23rd April 2019 at 07:15Hrs 1314MW    * What to do for WannaCry attacks: Please ensure all of your Windows environments have been updated as described in Microsoft Security Bulletin MS17-010 - Critical. Microsoft is providing Customer Guidance for WannaCrypt attacks    * Prevention of WannaCry Ransomware Threat - WebCast Session by Indian Computer Emergency Response Team (CERT-In)
OUR  MOTTO    RELIABILITY,  SECURITY  &  ECONOMY  IN  POWER  SYSTEM  OPERATION
Copyright 2004-13 hpaldc.org, All Rights Reserved, Site Maintained by HPALDC - HPSEBL
Best viewed in Crome with 1440 by 900 Screen Resolution
Your IP is: 192.168.9.1
Courtesy: www.nrldc.in, www.nrpc.gov.in, https://posoco.in