ON LINE SCHEDULING, REPORT GENERATION AND DECISION SUPPORT SYSTEM
HPSEBL - REAL TIME MASTER DISPLAY - SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM
.
Himachal Pradesh Area Load Despatch Center is ensuring integrated operation of the power system of HP State Electricity Board Ltd. with the Northern Region Load Dispatch Center of India. The main responsibilities of ALDC are:


P O W E R     F O R E C A S T

    P O W E R      S C E N A R I O
DATED TUESDAY, NOVEMBER 20, 2018
    Total Generation (Lus)    78.97
    Demand Met (Lus)    276.70
    Maximum Demand Met (MW)    1,532.00
    RE/Green Power Sold (Lus)    8.19

DAILY REPORTS - QUICK LOOK REVIEW
  • Monitoring of system parameters and security.
  • To ensure the integrated operation of the power system of HPSEBL with Northern Load Dispatch Center.
  • System studies, planning and contingency analysis.
  • Analysis of tripping/disturbances and facilitating immediate remedial measures.
  • Daily scheduling and operational planning.
  • Facilitating bilateral exchanges.
  • Computation of energy dispatch and drawal values using SEMs.
  • Augmentation of telemetry, computing and communication facilities.

REAL TIME NR FREQUENCY WEDNESDAY, NOVEMBER 21, 2018
  * Deviation Settlement Account for the week 291018-041118   * Agenda for 153rd OCC meeting.   * Provisional REA for the month of October 2018   * Notice for 153rd OCC meeting.   * Minutes of 152nd OCC meeting.   * Additional Agenda for the 40th TCC and 43rd NRPC Meeting.   * Agenda for the 40th TCC and 43rd NRPC Meeting.   * Allocation of Power from CGSs (Revision # 10/ 2018-19 w.e.f. 00:00 hrs of 20.10.2018   * Notice for the 40th TCC and 43rd NRPC Meeting.   * Minutes for the 39th TCC and 42nd NRPC Meeting.   * Final REA for the month of March, 2018   * Minutes for 13th meeting of TEST Sub committee.   * SINGLE LINE NETWORK DIAGRAM OF HPSEBL (66KV and above)   * Atlas of HPSEBL Power Grid with detail of Sub-Stations (66kV & above), Optical Network and PLCC network of HPSEBL. * MULTI-YEAR TARIFF PETITION FOR 3rd CONTROL PERIOD FY 2014-15 TO FY 2018-19 * HPSEBL - TARGET MONITORING & REVIEW SYSTEM      * GoHP Notification dated 10-06-2010: Notification & Agreement       * Procedure for Real Time Operations.
   * Maximum Demand of the State on Dated 19th November 2018 at 07:45Hrs 1532MW   * Minutes for 12th TEST Subcommittee meeting.    * What to do for WannaCry attacks: Please ensure all of your Windows environments have been updated as described in Microsoft Security Bulletin MS17-010 - Critical. Microsoft is providing Customer Guidance for WannaCrypt attacks    * Prevention of WannaCry Ransomware Threat - WebCast Session by Indian Computer Emergency Response Team (CERT-In)
OUR  MOTTO    RELIABILITY,  SECURITY  &  ECONOMY  IN  POWER  SYSTEM  OPERATION
Copyright 2004-13 www.hpaldc.org, All Rights Reserved, Site Maintained by HPALDC - HPSEBL