ON LINE SCHEDULING, REPORT GENERATION AND DECISION SUPPORT SYSTEM
HPSEBL - REAL TIME MASTER DISPLAY - SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM
.
Himachal Pradesh Area Load Despatch Center is ensuring integrated operation of the power system of HP State Electricity Board Ltd. with the Northern Region Load Dispatch Center of India. The main responsibilities of ALDC are:


P O W E R     F O R E C A S T

    P O W E R      S C E N A R I O
DATED TUESDAY, DECEMBER 12, 2017
    Total Generation (Lus)    64.08
    Demand Met (Lus)    237.18
    Maximum Demand Met (MW)    1,368.00
    RE/Green Power Sold (Lus)    3.75

DAILY REPORTS - QUICK LOOK REVIEW
  • Monitoring of system parameters and security.
  • To ensure the integrated operation of the power system of HPSEBL with Northern Load Dispatch Center.
  • System studies, planning and contingency analysis.
  • Analysis of tripping/disturbances and facilitating immediate remedial measures.
  • Daily scheduling and operational planning.
  • Facilitating bilateral exchanges.
  • Computation of energy dispatch and drawal values using SEMs.
  • Augmentation of telemetry, computing and communication facilities.
   * Maximum Demand of the State on Dated 12th December 2017 at 18:30 Hrs : 1368MW   * SINGLE LINE NETWORK DIAGRAM OF HPSEBL (66KV and above)   * Notice for 142nd OCC meeting.   * Deviation Settlement Account for the week 201117-261117   * Provisional REA for the month of November, 2017   * Allocation of Power from CGSs (Revision # 11/ 2017-18 w.e.f. 00:00 hrs of 1.12.2017)   * Minutes of 141st OCC meeting.   * Notice for 12th TeST Sub-Committee Meeting.   * Agenda for 141st OCC meeting.   * Final REA for the month of April, 2017   * Agenda for 37th TCC and 40th NRPC Meeting.   * Minutes for the 36TCC Meeting.   * Notice for the 37th TCC and 40th NRPC Meeting.   * Allocation of Power from CGSs (Revision # 06/ 2017-18 )   * Minutes for 11th meeting of TEST Subcommiittee.   * Agenda for 11th meeting of TEST Subcommiittee..   * Notice Inviting Tender for Sale of Renewable Power (Non-Solar) on Short Term Basis.   * Atlas of HPSEBL Power Grid with details of Sub-Stations (66kV & above), Optical Network and PLCC network of HPSEBL. * MULTI-YEAR TARIFF PETITION FOR 3rd CONTROL PERIOD FY 2014-15 TO FY 2018-19 * HPSEBL - TARGET MONITORING & REVIEW SYSTEM      * GoHP Notification dated 10-06-2010: Notification & Agreement       * Procedure for Real Time Operations.
   * What to do for WannaCry attacks: Please ensure all of your Windows environments have been updated as described in Microsoft Security Bulletin MS17-010 - Critical. Microsoft is providing Customer Guidance for WannaCrypt attacks    * Prevention of WannaCry Ransomware Threat - WebCast Session by Indian Computer Emergency Response Team (CERT-In)
OUR  MOTTO    RELIABILITY,  SECURITY  &  ECONOMY  IN  POWER  SYSTEM  OPERATION
Copyright 2004-13 www.hpaldc.org, All Rights Reserved, Site Maintained by HPALDC - HPSEBL
Best viewed in Crome with 1440 by 900 Screen Resolution
Your IP is: 192.168.9.1