Courtesy: www.nrldc.in, www.nrpc.gov.in, https://posoco.in               Login HINDI
P O W E R     F O R E C A S T
    P O W E R      S C E N A R I O
DATED FRIDAY, JANUARY 24, 2020
    Total Generation (Lus)    56.76
    Demand Met (Lus)    311.00
    Maximum Demand Met (MW)    1,757.00
    RE/Green Power Sold (Lus)    0.00

DAILY REPORTS - QUICK LOOK REVIEW


.
                                   HPSEBL - REAL TIME MASTER DISPLAY - SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM                                          
  * Deviation Settlement Account for the week 301219-050120   * Agenda for 167th OCC meeting.   * Notice for 167th OCC meeting.   * Minutes for 166th OCC meeting.   * Minutes for 165th OCC meeting.   * Provisional REA for the month of December 2019   * Minutes for the 44TCC-47NRPC Meeting.   * Minutes for 16th meeting of TEST Sub committee.   * Additional Agenda for 166th OCC meeting.   * Additional Agenda for the 44th TCC and 47th NRPC Meeting.   * Agenda Notice for the 44th TCC and 47th NRPC Meeting.   * Agenda for 16th meeting of TEST Subcommittee.   * Allocation of Power from CGSs (Revision # 08/ 2019-20 )   * Notice for 16th TEST Sub committee meeting.   * Revision in Allocation of Power from CGSs (Revision # 06/ 2019-20 )   * Additional Agenda-1-2-3 for the 43rd TCC and 46th NRPC Meeting.   * Final REA for the month of March, 2019   * Advance Meeting Notice for the 44th TCC and 47th NRPC Meeting.   * Additional Agenda for 15th meeting of TEST Subcommittee.   * Swapping of Power up to 550 MW on 'As and When Available/ Required Basis' Banking arrangements for FY 2019-20-Offers thereof   * Revision in Allocation of Power from CGSs (Revision # 12/ 2018-19 w.e.f. 00:00 hrs of 01.02.2019   * Tender Document for Sale by HPSEBL for 2019-2020   * Tender Document for Banking of Power by HPSEBL for 2019-2020   * Tender Document for Renewable Power by HPSEBL for 2019-2020   * Additional Agenda for the 40th TCC and 43rd NRPC Meeting.   * Notice for the 40th TCC and 43rd NRPC Meeting.   * SINGLE LINE NETWORK DIAGRAM OF HPSEBL (66KV and above)   * Atlas of HPSEBL Power Grid with detail of Sub-Stations (66kV & above), Optical Network and PLCC network of HPSEBL. * MULTI-YEAR TARIFF PETITION FOR 3rd CONTROL PERIOD FY 2014-15 TO FY 2018-19 * HPSEBL - TARGET MONITORING & REVIEW SYSTEM      * GoHP Notification dated 10-06-2010: Notification & Agreement       * Procedure for Real Time Operations.
   * Maximum Demand of the State on Dated 24th January 2020 at 08:15Hrs 1757MW    * What to do for WannaCry attacks: Please ensure all of your Windows environments have been updated as described in Microsoft Security Bulletin MS17-010 - Critical. Microsoft is providing Customer Guidance for WannaCrypt attacks    * Prevention of WannaCry Ransomware Threat - WebCast Session by Indian Computer Emergency Response Team (CERT-In)

HPALDC at a Glance:                   "Daily Scheduling & Operational Planning"
Himachal Pradesh Area Load Despatch Center is ensuring integrated operation of the power system of HP State Electricity Board Ltd. with the Northern Region Load Dispatch Center of India. The main responsibilities of ALDC are:
  • Monitoring of system parameters and security.
  • To ensure the integrated operation of the power system of HPSEBL with Northern Load Dispatch Center.
  • System studies, planning and contingency analysis.
  • Analysis of tripping/disturbances and facilitating immediate remedial measures.
  • Daily scheduling and operational planning.
  • Facilitating bilateral exchanges.
  • Computation of energy dispatch and drawal values using SEMs.
  • Augmentation of telemetry, computing and communication facilities.

              REAL TIME NR FREQUENCY SUNDAY, JANUARY 26, 2020
    D E M A N D      T R E N D S      R E S T R I C T E D
UPDATED ON FRIDAY, JANUARY 24, 2020
 FY   Total DEMAND (Lus)         MAXIMUM DEMAND (MW)         MINIMUM DEMAND (MW)   AVERAGE DEMAND (MW)
 2016-17
.
                 7837   1499 MW on 03-Mar-17 at 07:30Hrs   419 MW on 14-Mar-17 at 01:45Hrs                     1030
 2017-18
.
                94980   1594 MW on 13-Jan-18 at 09:30Hrs   408 MW on 03-Mar-18 at 02:45Hrs                     1084
 2018-19
.
                100395   1700 MW on 27-Dec-19 at 09:15Hrs   428 MW on 22-Mar-19 at 02:45Hrs                     1146
 2019-20
(upTo Dec-2019)
                77438   1729 MW on 28-Dec-19 at 09:45Hrs   448 MW on 28-Oct-19 at 01:30Hrs                     1173


OUR  MOTTO    RELIABILITY,  SECURITY  &  ECONOMY  IN  POWER  SYSTEM  OPERATION
Copyright ? 2004-13 hpaldc.org, All Rights Reserved, Site Maintained by HPALDC - HPSEBL
Best viewed in Crome with 1440 by 900 Screen Resolution
Your IP is: 192.168.9.1
Courtesy: www.nrldc.in, www.nrpc.gov.in, https://posoco.in